Assessment of water and constituent transport in the L31N canal following two hydraulic alterations to flow within and to the Everglades National Park Grant

date/time interval

  • October 1, 2014 - December 31, 2016

awarded by

sponsor award ID

  • P14AC01405

local award ID

  • AWD000000004772

contributor

  • Price, Rene   Principal Investigator   2014 - 2016