SR 924/NW 119 Street Adaptive Signal Control Technology (ASCT) Pilot Project Evaluation Phase 3 Grant

date/time interval

  • September 14, 2018 - December 30, 2020

sponsor award ID

  • BDV29 TWO 662-23

local award ID

  • AWD000000009486

contributor

  • Hadi, Mohammed   Principal Investigator   2018 - 2020
  • Wang, Tao   Co-Principal Investigator   2018 - 2020