A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines Article

Koulamas, Christos, Kyparisis, George J.. (2007). A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines . EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 182(2), 945-951. 10.1016/j.ejor.2006.07.027



cited authors

  • Koulamas, Christos; Kyparisis, George J.

publication date

  • 2007

Digital Object Identifier (DOI)

start page

  • 945

end page

  • 951

volume

  • 182

issue

  • 2

research area